Top Filler

Cost benefit

Lower costs of materials, labour and time. One-stop purchasing without additional cost.

Green concept

100% recycled materials, 35% energy saving than the traditional construction, 8%-15% more usable space, cleaner & safer construction sites, dry work-90% water saving.

High strength & lightweight

Longer spans, larger open spaces, less load bearing, simple foundation.

Anti-earthquake

Up to level 8 on Richter magnitude scale and reduced influence of shake due to its soft and light structure. Also it can transfer the strength from the earthquake to whole structure.

Fire resisting

Steel frame with fireproof treatment is non-combustible fire rated up 2.5.

Material cost

Our product is significantly less expensive compared with other building materials.

Tools & equipment

Using our solution, your tools and equipment input is significantly reduced.

Transportation costs

The entire steel frame for your building project is shipped as one, thus significantly reducing raw material transportation cost. It is quite normal for all major supplies for one project to be on site in a single transportation instance.

Building fixtures and services installation

Contractors can save on installation costs for plumbing, electrical and other subcontracted installation. Our approach smartly accommodates such installation at minimal cost.